Performance of Underground Electricity Cables During the 2010-2011 Canterbury Earthquake Sequence: Insights for Assessing Criticality and Resilience (2018)
Abstract
Asset management in power systems is exercised to improve network reliability to provide confidence and security for customers and asset owners. While there are well-established reliability metrics that are used to measure and manage business-as-usual disruptions, an increasing appreciation of the consequences of low-probability high-impact events means that resilience is increasingly being factored into asset management in order to provide robustness and redundancy to components and wider networks. This is particularly important for electricity systems, given that a range of other infrastructure lifelines depend upon their operation. The 2010-2011 Canterbury Earthquake Sequence provides valuable insights into electricity system criticality and resilience in the face of severe earthquake impacts. While above-ground assets are relatively easy to monitor and repair, underground assets such as cables emplaced across wide areas in the distribution network are difficult to monitor, identify faults on, and repair. This study has characterised in detail the impacts to buried electricity cables in Christchurch resulting from seismically-induced ground deformation caused primarily by liquefaction and lateral spread. Primary modes of failure include cable bending, stretching, insulation damage, joint braking and, being pulled off other equipment such as substation connections. Performance and repair data have been compiled into a detailed geospatial database, which in combination with spatial models of peak ground acceleration, peak ground velocity and ground deformation, will be used to establish rigorous relationships between seismicity and performance. These metrics will be used to inform asset owners of network performance in future earthquakes, further assess component criticality, and provide resilience metrics.
Rights
CC-BY 4.0 InternationalRelated items
Showing items related by title, author, creator and subject.
-
Performance of horizontal infrastructure in Christchurch city through the 2010-2011 Canterbury earthquake sequence
Cubrinovski, M.; Hughes, M.; Bradley, Brendon; Noonan, J.; Hopkins, R.; McNeill, S.; English, G. (University of Canterbury. Civil and Natural Resources Engineering, 2014)This is an interim report from the research study performed within the NHRP Research Project “Impacts of soil liquefaction on land, buildings and buried pipe networks: geotechnical evaluation and design, Project 3: Seismic ... -
Assessing the seismic resilience of an underground lifeline: Case study of the Christchurch City potable water network
Bellagamba, Xavier; Bradley, Brendon; Hughes, Matthew W.; Wotherspoon, Liam (Quake CoRE, 2016)essential systems upon which the well-being and functioning of societies depend. They deliver a service or a good to the population using a network, a combination of spatially-distributed links and nodes. As they ... -
Geotechnical & flooding reconnaissance of the 2014 March flood event post 2010-2011 Canterbury earthquake sequence, New Zealand. Report No. GEER035
Allen, J.; Davis, C.; Giovinazzi, S.; Hart, D.E.; Cochrane, T.; Deam, B.; De Pascale, G.; Hicks, M.; Holland, D.; Hughes, M.; Johnson, L.; Ko, S.Y.; Measures, R.; Quigley, M.; Rix, G.; Siembieda, W.; Stark, N.; Teasley, R.; Wotherspoon, L.; van Ballegooy, S. (GEERUniversity of Canterbury. Civil and Natural Resources EngineeringUniversity of Canterbury. GeographyUniversity of Canterbury. Geological Sciences, 2014)