Transport infrastructure performance and management in the South Island of New Zealand, during the first 100 days following the 2016 Mw 7.8 “Kaikōura” Earthquake

Type of content
Journal Article
Publisher's DOI/URI
Thesis discipline
Degree name
Publisher
Journal Title
Journal ISSN
Volume Title
Language
Date
2017
Authors
Davies AJ
Sadashiva V
Aghababaei M
Barnhill D
Costello SB
Fanslow B
Headifen D
Hughes MW
Kotze R
Mackie J
Abstract

At 00:02 on 14th November 2016, a Mw 7.8 earthquake occurred in and offshore of the northeast of the South Island of New Zealand. Fault rupture, ground shaking, liquefaction, and co-seismic landslides caused severe damage to distributed infrastructure, and particularly transportation networks; large segments of the country’s main highway, State Highway 1 (SH1), and the Main North Line (MNL) railway line, were damaged between Picton and Christchurch. The damage caused direct local impacts, including isolation of communities, and wider regional impacts, including disruption of supply chains. Adaptive measures have ensured immediate continued regional transport of goods and people. Air and sea transport increased quickly, both for emergency response and to ensure routine transport of goods. Road diversions have also allowed critical connections to remain operable. This effective response to regional transport challenges allowed Civil Defence Emergency Management to quickly prioritise access to isolated settlements, all of which had road access 23 days after the earthquake. However, 100 days after the earthquake, critical segments of SH1 and the MNL remain closed and their ongoing repairs are a serious national strategic, as well as local, concern. This paper presents the impacts on South Island transport infrastructure, and subsequent management through the emergency response and early recovery phases, during the first 100 days following the initial earthquake, and highlights lessons for transportation system resilience.

Description
Citation
Davies AJ, Sadashiva V, Aghababaei M, Barnhill D, Costello SB, Fanslow B, Headifen D, Hughes MW, Kotze R, Mackie J, Ranjitkar P, Thompson J, Troitino DR, Wilson TM, Woods S, Wotherspoon LM (2017). Transport infrastructure performance and management in the South Island of New Zealand, during the first 100 days following the 2016 Mw 7.8 “Kaikōura” Earthquake. Bulletin of the New Zealand Society for Earthquake Engineering. 50(2). 271-271.
Keywords
Ngā upoko tukutuku/Māori subject headings
ANZSRC fields of research
Fields of Research::40 - Engineering::4005 - Civil engineering::400506 - Earthquake engineering
Fields of Research::40 - Engineering::4005 - Civil engineering::400512 - Transport engineering
Field of Research::15 - Commerce, Management, Tourism and Services::1507 - Transportation and Freight Services
Rights