Description
Since the mid 1990s, the Christchurch inventory of substation buildings was seismically retrofitted as part of the Risk and Realities improvement programme. • The substation buildings were retrofitted using a system of simple and cost-effective steel elements. • The 2010/2011 Canterbury earthquakes caused significant immediate disruption to power distribution network in Christchurch. • It took a single day in September 2010 and ten days in February 2011 to restore power to 90% customers. Tostudytheseismicperformanceofmasonrysubstationbuildingsfromamulti-disciplinary perspective on structural,economic and social aspects.
Citation
Keywords
Ngā upoko tukutuku/Māori subject headings
ANZSRC fields of research
Rights
CC-BY 4.0 International